基于PSCAD/EMTDC的電力系統中性點接地方式研究
作者: 梁越明 安徽省化工設計院 上傳時間:2012/9/17 13:01:34
摘要:電力系統中性點的運行方式涉及系統的電壓等級、電力網絡結構、絕緣水平、通信干擾、接地保護方式和保護整定等許多方面,是一個綜合性的復雜問題。目前,對電力系統的中性點接地方式的選擇,多基于以往運行經驗。本文利用PSCAD/EMTDC軟件建立了電力系統的中性點運行方式的仿真模型,模擬了各種運行方式下,線路上發生單相接地故障時,電氣參數的變化情況,并綜合考慮系統可靠性、絕緣水平和繼電保護的要求,確定了各種運行方式的適用范圍。文中所建模型及結論對于分析高階、非線性的電力系統暫態過程具有借鑒意義。
敘詞:PSCAD/EMTDC 電力系統 中性點接地消弧線圈
Abstract:Neutral point grounding which is related to voltage level, network structure, insulation, communication and relay protection is very important problem to power system. Nowadays, the choice of neutral point grounding mode mainly relies on operation experiences or theoretical analysis which could not give a direct view of the dynamics of electric power system during disturbances. Therefore, this paper has established the simulation model of electric power system neutral point grounding with PSCAD/EMTDC to show the dynamics of neutral point grounding when disturbed by single-phase grounding in transmission lines, and the application of each neutral point grounding mode has been analyzed according to simulation results. The dynamic model of neutral point grounding in this paper is meaningful to the analysis of high-order, non-linear transients of power system as well.
Keyword:PSCAD/EMTDC, Power system, Neutral point grounding, arc suppression
說明:本站會員正確輸入用戶名和密碼進行登錄系統后才能查看文章詳細內容和參與評論。
--本文摘自《電源世界》,已被閱讀128413次
免責聲明:本文僅代表作者個人觀點,與電源在線網無關。其原創性以及文中陳述文字和內容未經本站證實,對本文以及其中全部或者部分內容、文字的真實性、完整性、及時性本站不作任何保證或承諾,請讀者僅作參考,并請自行核實相關內容。
關于本文的網友評論:
本文暫時還沒有網友發表評論信息!